Seawing two-storey building, M. Dhiggaru

3D models of approval set DO-20-2025, converted from concrete to a steel frame.

Design development. The steel drawings are issued for approval, not for fabrication, and the stair is on hold. A registered engineer and the architect check and sign before construction.